|
Navigation |
 |
|
|
|
| Administrative Supports >> Civil Engineering |
| MAIN RESPONSIBLITIES |
- Distribution of drinking water to the residential
area,ward block ( C ) & hostel area from the stream
source by operating old high level tank.
- Distribution of drinking water to the new hospital
area from new overhead tank supplied from Tarahara
coordinating with NWSC.
- Maintenance and operation of stream sources with its
pipe line network system.
- Maintenance and operation of new and old sewage
treatment plant with its pipe line network system.
- Design, drawing, estimating for the Renovation,
modification and construction of various buildings and
other civil related job as per requirement.
- Attending, executing and managing day to day Civil
related complaints.
- Preparation of tender document, supervision of
various civil related works.
|
| PLAN OF ACTION |
- Fourth phase painting work-Building ( F )-type-25
nos buildings,( G )-type -8 buildings,H2-4 buildings,
First phase Hospital buildings-Emergence,G.O.P.D.,S.O.P.D.
- Water proofing work in buildings-148,200,112.
- Renovation of Road phase-III.
- Fencing around Sewage Treatment plant.
- Gabion Works at Kholsi.
- Dental College curtain fixing work.
- Building-45,43 for School of Public Health.
- Painting of building-153.
- Fencing around building-G, G1, G2, F, D type
residence
|
|
|
© B.P. Koirala Institute of Health Sciences, Dharan, Nepal, Phone
:+977-25-525555,+977-25-521017,Fax: +977-25-520251
Site Optimization: -800X600 or 1024x778 in IE 4.5+, Mozila, Opera
» For Any inconvenience contact to
webmaster |
|